Rail / Tie Gang
A Rail/Tie Gang is a specialized team within the railway maintenance sector responsible for the installation, replacement, and repair of rail tracks and ties (the wooden or concrete beams that support the rails). This team plays a crucial role in ensuring the safety, stability, and longevity of the rail infrastructure.
Key Responsibilities:
- Rail Replacement: Removing old or damaged rail sections and installing new ones to maintain track integrity.
- Tie Installation and Replacement: Installing new ties or replacing worn-out ones to provide the necessary support for the rails.
- Track Alignment: Ensuring that the rails are properly aligned and secured to maintain smooth train operations and reduce wear on rolling stock.
- Ballast Maintenance: Managing the ballast (the crushed stone beneath the ties) to ensure proper drainage and stability of the track structure.
Skills and Equipment:
- Specialized Tools: The gang uses various tools and equipment, including rail saws, tie extractors, and ballast regulators, to perform their tasks efficiently.
- Safety Protocols: Team members are trained in safety practices, including working near active tracks, to protect themselves and passing trains.
Overall, a Rail/Tie Gang is essential for maintaining the safety and functionality of railway networks, ensuring that trains can operate smoothly and efficiently.
Our Services Include
We possess the experience and expertise to execute a variety of railway track removal projects for diverse clients. Our team is adept at handling complex operations with tight timelines and high customer expectations. We collaborate closely with our clients and professional advisors to fully understand their specific needs and requirements.
Working Process
We are proud to have our Occupational Health and Safety Management System CORTM Certified.
categories
Let’s Start Work Together
851 Haldimand, Hwy#56 RR#1
York, ON N0A 1R0